
New TopShim run:

version = topshim 2.4.0
date = 2025-02-03
time = 23:02:21.124
command = topshim  tunea

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = DMSO
shim nucleus = 2H
nucleus optimised for = 19F
o1p (from lock) = 2.49 ppm

Results:

NOTE: No 19F B1-profile found. Optimizing shimming as if for NMR nucleus = 1H


1D Shimming:
Iteration  1: FWHM Before= 1.8 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.583


Performing tune after shimming
tune lock level increase = 1.2

shim changes: 
Z	-137
Z2	+7
Z3	+80
Z4	+214
Z5	+40
Z6	-2356
Z7	-641
Z8	+10074
X	+137
XZ	+1
Y	+138
YZ	-4

duration = 2 min 26 sec
completed successfully
finished Mon Feb  3 23:04:45 2025


========================================================================
